[Verse 1]
Ore pulled by diesel, tailings wide,
Refinement under state oversight.
No audit logs for heat released,
Lifecycle begins with falsified peace.

[Pre-Chorus]
Gaseous diffusion, grid demand peak,
Centrifuge cascade, emission leak.
Pelletized oxide, forged in heat,
Declared clean, with waste release.

[Chorus]
No full-cycle analysis,
Just upstream load and downstream risk.
Every stage, an input debt,
Each output masked, liability kept.
No independent public review.

[Verse 2]
Construction span: 12-year drift,
CapEx breach, federal lift.
Startup grid-fed, base not met.

[Bridge]
Contractors cycled, milestones stalled,
Bid extensions never called.
Funds allocated, then delayed,
Liability forever unpaid.

[Chorus]
No full-cycle analysis,
Fuel integrity, deferred abyss.
Lifecycle curve, split across sectors,
Core integrity over grid design.

[Verse 3]
Spent fuel management deferred by years,
Dry cask placement, cost unclear.
Geological storage not yet built,
Deferred liability, taxpayer guilt.

[Outro]
Final entry, system end:
No full cycle. No closed account.
Input borrowed. Time ran out.
